Description
MODEL SPECIFIC KIT - WITHOUT MODIFICATION
The BARRACUDA EXTRA-LIGHT BRACKET kit for MOTORBIKES with SIZE FORK 48-51 diameter applies to existing fixing points without modifications on the original part of the bike.
They are made of lightened INOX 30/10, to have a resistant but at the same time light structure.
They can be used for other types of universal supplementary lights.
Available in black color.
Warnings:
- Additional lights must be purchased separately!
- If there are tubular protections in the motorcycle, carefully check that there is enough space for fixing the brackets.
The kit includes:
- 2 brackets for additional lights
- Assembly kit.
- Assembly instructions.
They are made of lightened INOX 30/10, to have a resistant but at the same time light structure.
They can be used for other types of universal supplementary lights.
Available in black color.
Warnings:
- Additional lights must be purchased separately!
- If there are tubular protections in the motorcycle, carefully check that there is enough space for fixing the brackets.
The kit includes:
- 2 brackets for additional lights
- Assembly kit.
- Assembly instructions.
The BARRACUDA EXTRA-LIGHT BRACKET kit for MOTORBIKES with SIZE FORK 48-51 diameter applies to existing fixing points without modifications on the original part of the bike.
They are made of lightened INOX 30/10, to have a resistant but at the same time light structure.
They can be used for other types of universal supplementary lights.
Available in black color.
Shipping costs:
Domestic Standard Shipping - FREE on orders over $99.00 / $15 under $99.00
Canada / Mexico - FREE on orders over $149.00 / $30 under $149.00
Delivery time:
Available: The item is in stock in the USA. For USA stock there is an expected delivery time of 2-7 business days within the USA. Additional transit time applies to shipments to Canada and Mexico.
Not available: The item is not in stock in the USA but may be available for special order. Please email [email protected] with your interest. We will kindly respond with availability and an appropriate lead time.